Company Details
Yangzhou Jiangdu Chenguang Special Equipment Factory
Payment Type: | L/C,T/T,D/P,Paypal,Money Gram,Western Union |
---|---|
Incoterm: | FOB,CFR,CIF,FCA,CPT |
Min. Order: | 10000 Square Meter |
Model No.: PET9030
Brand: Fibtex
Material: High Tenacity Polyester Yarn + SBR Or PVC
Width: 1-6m
Mesh Size: 12.5mm-50mm
Roll Length: 50m, 100m, 200m, Ect.
Colour: Black, White, Green, Red Etc.
Package: PE Film Or Polybag Or Pallet
Tensile Strength: 20knx20kn To 800x800kn/m
Type: Polyester Unaxial Geogrid And Biaxial Geogrid
Application: Retaining Wall, Slope, Soil Stablization, Landfill Etc.
Certificates: ISO9002, CE, ITB, ASTM
Packaging: PE film or Polybag or Pallet
Productivity: 200000sqm/day
Transportation: Ocean,Land,Air,FedEX etc.
Place of Origin: Shandong, China
Supply Ability: 300000sqm/day
Certificate: ISO9001, CE, ITB
HS Code: 39269090
Port: Qingdao,Tianjin,Shanghai
Payment Type: L/C,T/T,D/P,Paypal,Money Gram,Western Union
Incoterm: FOB,CFR,CIF,FCA,CPT
High Strength Uniaxial PVC Coated Polyester Geogrid consists of a geosynthetic polymer that is mechanically altered to form a sheet of apertures that interlock with the material placed over them, forming a specialized fortification used for earth retaining wall stabilization and basal and bank reinforcements. Uniaxial PVC Coated PET Geogrid is a high tenacity, warp knitted geogrid, featuring warp polyester yarns knitted together to form flexible junctions, and is then additionally coated with a polyester polymer providing high resistance to possible degradation due to an alkaline soil environment, and additional UV and mechanical damage. High Strength Uniaxial Polyester Geogrid works in a uniaxial manner, with their primary strength working in the single direction, and are suitable for use behind retaining walls and slopes as a method of reinforcement.
Certificate: ISO9002, CE, ITB
Features and Benefits
Applications
Technical Data
Type Item No. Tensile Strength Elongation Mesh Size Width MD CD (%) (mm*mm) (m) Polyester Uniaxial Geogrid PET5030 30 30 13 12-50 1-6 PET6030 60 30 13 12-50 1-6 PET8030 80 30 13 12-50 1-6 PET10030 100 30 13 12-50 1-6 PET11030 110 30 13 12-50 1-6 PET120/30 120 30 13 12-50 1-6 PET15030 150 30 13 12-50 1-6 PET20030 200 30 13 12-50 1-6 PET30030 300 30 13 12-50 1-6 PET40050 400 50 13 12-50 1-6 PET50050 500 50 13 12-50 1-6 PET60050 600 50 13 12-50 1-6 PET80050 800 50 13 12-50 1-6 Polyester Biaxial Geogrid PET3030 30 30 13 12-50 1-6 PET4040 40 40 13 12-50 1-6 PET5050 50 50 13 12-50 1-6 PET6060 60 60 13 12-50 1-6 PET8080 80 80 13 12-50 1-6 PET9090 90 90 13 12-50 1-6 PET100100 100 100 13 12-50 1-6 PET110110 110 110 13 12-50 1-6 PET120120 120 120 13 12-50 1-6 PET150150 150 150 13 12-50 1-6 PET180180 180 180 13 12-50 1-6 PET200200 200 200 13 12-50 1-6 PET300300 300 300 13 12-50 1-6 PET350350 350 350 13 12-50 1-6 PET400400 400 400 13 12-50 1-6 PET450450 450 450 13 12-50 1-6 PET500500 500 500 13 12-50 1-6 PET600600 600 600 13 12-50 1-6 PET700700 700 700 13 12-50 1-6 PET800800 800 800 13 12-50 1-6
(kN/m)
Packages
Wound by Cardboard ot PVC tube, then wrapped by PE film or polybag.
How to install Polyester Geogrid
Step 1:Excavate reinforced soil area.
Remove existing soils in the reinforced soil area to the maximum embedment length of the geogrid design. Provide a generally level soil condition behind the wall units for the placement of each geogrid layer.
Step 2: Cut Geogrid.
Cut sections from geogrid roll to the specified length (embedment depth). Geo-grid roll direction is from the wall toward the embankment (check manufacturer's criteria). In most cases correct orientation is to roll the geogrid perpendicular to the wall face.
Step 3: Install Geogrid.
Hook geogrid over the Fiberglass pins to ensure a positive mechanical connection between the unit and geogrid
Step 4: Secure Geogrid.
Pull the pinned geogrid taut to eliminate loose folds. Stake or secure back edge of geo-grid before and during backfill and compaction. Remove stakes, if desired, once backfill is placed. Place additional sections of geogrid, abutting each other, for continuous coverage at each layer.
Step 5: Install next course of units.
Check for level with each new course.
Step 6: Place compacted backfill over geogrid in 8" lifts.
Provide a minimum of six inches reinforced fill coverage prior to driving equipment over the geogrid with wheeled or tracked equipment. Avoid driving or turning equipment directly on geogrid to avoid excessive damage.
Product Categories : Geosynthetics Series > Polyester Geogrid